High Efficiency Multiple Nozzles in High Head Areas Hydro Pelton Turbine

High Efficiency Multiple Nozzles in High Head Areas Hydro Pelton Turbine

Package Size 3520.00cm * 3520.00cm * 4850.00cm Package Gross Weight 15000.000kg High Efficiency Multiple Nozzles in High
Basic Info.
Model NO. CJA475-L-42/4*5
Size Large
Type Horizontal Hydro Generator
Bearing Support Umbrella Type
Speed Low Speed
Bearing Number 3
Standard Standard
Valve Gate Valve / Ball Valve
Excitation Device Integrated Control Panel
Governor Sdt-300
Certificate ISO9001/CE/TUV/SGS
Keyword Pelton Turbine
Processing Method CNC Machining / Constant Temperature Annealing
Rated Rotating Speed 1000r/Min
Efficiency of Generator 93.5%
Efficiency of Turbine 92.5%
Flow Rate 0.08-0.1m3/S
Net Head 100m to 270m
Transport Package Wood Box
Specification 15-30 cubic
Trademark Forster
Origin China
HS Code 8502390010
Production Capacity 50pieces/Year
Packaging & Delivery
Package Size 3520.00cm * 3520.00cm * 4850.00cm Package Gross Weight 15000.000kg
Product Description

High Efficiency Multiple Nozzles in High Head Areas Hydro Pelton Turbine

Our main products included:

1.Kaplan turbine generators series.

2.Turgo turbine generators series,e.g. vertical type horizontal type.

3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.

4. Francis turbine generators series.

5.Pelton turbine generators series and double turbine generators series and so on.

6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc

High Efficiency Multiple Nozzles in High Head Areas Hydro Pelton Turbine

Product features:

1.suitable for high head,small flow and flow changes in large runoff hydropower station.

2.With the power plant investment is small,compact units structure characteristics.

3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.

4.Suitable for high head,small flow station in mountainous area.

5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.

Product parameters:
Hydro Pelton Wheel Performance Data And Supporting Table
ModelTurbine ParametersGenerator ParametersDriving modeSpeed WayWater Intake
Design head(m)Under the design headDesign speed (r/min)The power of generatorRated speed(r/min)Runaway speed(r/min)Vavel controlGuide vane controlDiameter (mm)
Flow rate (m3/s)The output(kw)
CJ237-W-55/1x4.51600.085611092010010002200Straight leaguemanuallyYTT-35250
1700.088212294810010002200Straight leaguemanuallyYTT-35250
1800.090813397612510002200Straight leaguemanuallyYTT-35250
1900.0933144100212510002200Straight leaguemanuallyYTT-35250
2000.0957155102912510002200Straight leaguemanuallyYTT-35250
2100.098166105416010002200Straight leaguemanuallyYTT-35250
2200.1004178107916010002200Straight leaguemanuallyYTT-35250
2300.1026189110616010002200Straight leaguemanuallyYTT-35250
2400.1048200112720010001800Straight leaguemanuallyYTT-35250
2500.107212115020010001800Straight leaguemanuallyYTT-35250
2600.1091223117320010001800Straight leaguemanuallyYTT-35250
2700.1112235119520010001800Straight leaguemanuallyYTT-35250

Product pictures:

High Efficiency Multiple Nozzles in High Head Areas Hydro Pelton Turbine


High Efficiency Multiple Nozzles in High Head Areas Hydro Pelton Turbine

High Efficiency Multiple Nozzles in High Head Areas Hydro Pelton Turbine

High Efficiency Multiple Nozzles in High Head Areas Hydro Pelton Turbine


Company Information

Our workshop

Advantages



Engineering Case


Packaging & Shipping


FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: cdforster.en.made-in-china.com